Live Reference Filter

Find Testimonials That
Match Your Project

Select project type, size, and region — results update instantly from 9 verified references.

9
Matching Reviews
—
Avg. Score
Compare Us to Your Current Bid
0
Projects Completed
0.0/5.0
Avg. Satisfaction Score
+0.0 days
Avg. Ahead of Schedule
0.0%
Budget Accuracy Rate
0 states
Sun Belt Coverage

Project Reference Archive

9 verified testimonials — pin up to 3 for side-by-side comparison

Click the pin icon on any card to add it to your comparison tray
Peoria Commons Strip Mall — Phase 2 construction site thumbnail
Commercial
Peoria Commons Strip Mall — Phase 2
Peoria, AZ · Jan 2026
Brenda Kowalczyk headshot
Brenda Kowalczyk
VP of Construction
SunState Development Partners
4.9
7d early
$4.8M – $5.2M
"Phase 2 came in $31k under budget with a seven-day early delivery. We have used six GCs on this corridor over eight years — Scaffold is the only one we are calling for Phase 3."
Performance Ratings
REF-2026-01238,500 sf
Ponte Vedra Admin Annex construction site thumbnail
Municipal
Ponte Vedra Admin Annex
Ponte Vedra, FL · Mar 2026
Angela Fontenot headshot
Angela Fontenot
Director of Capital Projects
St. Johns County School District
4.9
6d early
$1.8M – $2.1M
"Six days early and every single RFI responded to within 24 hours. I have managed 19 capital projects for this district — Scaffold's communication discipline is in a different category."
Performance Ratings
REF-2026-01911,600 sf
Station 47 Fire Station Rebuild construction site thumbnail
Municipal
Station 47 Fire Station Rebuild
San Antonio, TX · Nov 2025
Marcus Delgado headshot
Marcus Delgado
Director of Facilities
Bexar County Municipal Services
4.8
4d early
$2.1M – $2.4M
"Scaffold delivered Station 47 four days ahead of schedule with zero punch-list items at final walk. Their superintendent was on-site every morning before my crew arrived. That kind of accountability is rare."
Performance Ratings
REF-2025-04714,200 sf
Charlotte Medical Arts Building Reno construction site thumbnail
Renovation
Charlotte Medical Arts Building Reno
Charlotte, NC · Feb 2026
Priya Nambiar headshot
Priya Nambiar
Senior Project Manager
Trident General Contracting
4.8
3d early
$680K – $820K
"Medical-grade cleanliness requirements throughout. Their crew maintained negative-pressure barriers the entire duration — no exceptions, no shortcuts. The infection-control officer signed off on day one of occupancy."
Performance Ratings
REF-2026-0084,100 sf
Savannah Gateway Retail Center construction site thumbnail
Commercial
Savannah Gateway Retail Center
Savannah, GA · Sep 2025
Lena Marchetti headshot
Lena Marchetti
Project Executive
Coastal Ridge Contractors
4.7
11d early
$3.2M – $3.6M
"Eleven days early on a 26,000-square-foot shell build in a coastal climate. Their logistics coordinator had materials staged before we even issued the morning briefing. I have already referred them to two colleagues."
Performance Ratings
REF-2025-07126,400 sf
Tempe Public Works Maintenance Facility construction site thumbnail
Municipal
Tempe Public Works Maintenance Facility
Tempe, AZ · Dec 2025
Darnell Washington headshot
Darnell Washington
Assistant City Manager
City of Tempe, AZ
4.6
On schedule
$5.5M – $6.1M
"On the day. Not a day early, not a day late. For a municipal project with a hard ribbon-cutting date tied to a council session, that precision is worth more than any schedule bonus clause."
Performance Ratings
REF-2025-10331,000 sf
Katy Freeway Strip Mall Expansion construction site thumbnail
Commercial
Katy Freeway Strip Mall Expansion
Houston, TX · Aug 2025
James Rutherford headshot
James Rutherford
COO
Lone Star Retail Properties
4.6
5d early
$8.4M – $9.0M
"A 62,000-square-foot expansion on an active shopping corridor. They managed tenant-adjacency noise windows, coordinated with four utility providers, and still delivered five days early. Budget variance was under one percent."
Performance Ratings
REF-2025-05662,000 sf
Riverview Senior Living Wing — East Addition construction site thumbnail
Renovation
Riverview Senior Living Wing — East Addition
Tampa, FL · Oct 2025
Terrence Okafor headshot
Terrence Okafor
Procurement Officer
Hillsborough County Public Works
4.5
2d late
$1.3M – $1.6M
"Working in an occupied senior wing requires a completely different level of dust control and noise management. Scaffold's crew treated our residents with genuine respect. Two days late on a complex active-facility renovation is frankly exceptional."
Performance Ratings
REF-2025-0899,800 sf
Myrtle Beach Boardwalk Retail Renovation construction site thumbnail
Renovation
Myrtle Beach Boardwalk Retail Renovation
Myrtle Beach, SC · Jul 2025
Carlos Espinoza headshot
Carlos Espinoza
Principal
Espinoza & Holt Construction
4.4
1d early
$940K – $1.1M
"Seasonal deadline was non-negotiable — had to be open before Memorial Day weekend. They finished a day early and the tenant moved in without a single warranty call in the first 90 days."
Performance Ratings
REF-2025-0447,200 sf
Primary CTA

Compare Us to
Your Current Bid

Send us your project type, zip code, and your current contractor's name or bid summary. We'll respond within one business day with a side-by-side reference comparison.

We keep all bid information strictly confidential.
Secondary Path

Download Our
Reference Pack

A formatted PDF with our top 12 verified references, organized by project type — ready to attach to your RFP file.

Pack Contents
12 verified project references
Aggregate performance metrics
Geographic coverage map
Direct contact info for each reference
Signed verification statements
Work email only. No newsletters, no sales sequences.
Verified References
No Spam
RFP-Ready Format